Saturday, May 24, 2008

MEMORIAL DAY WEEKEND - THE START OF SUMMER

SHIP'S LOG:

Safe and Sound and still at the Dock! Hey, it is a step up from last Memorial Day Weekend! True, it would be better to be over in New London at TYC, but the mooring isn't set yet and I am still waiting on the yard which is waiting on a supplier for an oil filter for the engine. Aside from that, anything that really needs to be done and everything else can be done on the can.

I am coming to the conclusion that in this yard, most people own big sailboats and that most of the owners have little or no idea what to do with them or how to handle them. Two rather large craft nearly rammed each other as they backed out of slips that were opposite each other. One "captain" at least realized that boats don't have brakes. Had this realization not have dawned on him there surely would have been a "little trading of paint," as they say in NASCAR! I have to admit that I am not sure exactly how the boating "Rules of the Road" applied in that particular situation, but you would think that common sense and common courtesy would apply. Unfortunately, people who really don't "bond" with their boats tend to "drive" them like cars and when you have a holiday weekend, you also have a multiplicity of such people on the water. It makes for some rather interesting "encounters". The mouth of the Thames on a holiday is something akin to I-95 going through New Haven if you lane lines and the traffic separation barriers. And while the Mystic River doesn't have quite the traffic, it is small and narrow and crazy in its own way.

Two people, with their boats attached firmly to the dock, had people fall off their boats into the water. True it is easily in the season and people may not have their sea legs yet, but it is scary that they would do so while the crafts are still attached securely to the dock. Happy Memorial Day Weekend! ! ! ! !

MASTER'S PERSONAL LOG:

It is irritating that I am still in Mystic. As I have said before, it is tough surrendering control. Waiting on other people who are waiting on other people before you can do something is terribly frustrating, but why eat myself of over something I have no control over. It is coming and it will be here eventually and I will enjoy it when it gets here.

Thursday, May 22, 2008

THE BEST LAID PLANS OFT GO ASTRAY!!!!!

SHIP'S LOG:

Well, despite all of the best of intentions, things just didn't quite go the way I had planned. Then again, what else is new? I actually spent more time "figuring" than actually working. Work was done but not quite what was planned.

The main deck hatch leak was dry so that problem is solve, but there was still a leak from somewhere around the cockpit hatch. Taking down the overhead, I discovered that part of the wooden hatch frame had all the strength of wet cardboard. I had gouge out all the punky wood and repair it with epoxy putty. It is the stuff you see advertised on TV as "Mighty Putty," and it is actually great stuff. I molded it to fill the rotted portion and in an hour the repair was complete. I then had to caulk every single seam of the deck hatch frame, filling every single crack and hole. If it still leaks after all this, and last night's rain and the rain today should be a real test, then I have no clue how the water is getting in.

Being in a wood repairing mood, having the tools necessary, I decided to fix a piece that broke off of the toe rail on the starboard side. Some holes were drilled in it for some reason sometime and whatever it was was removed and the holes were never filled. As a result, the wood rotted and cracked and a chunk fell off. SO it was a simple glue-&-C-Clamp fix, filling the holes as I went. I am going to have to repeat the process on the port side as well. I wonder what was there and where it went?

Now with regards to the plumbing. Sinks and showers first. Wouldn't you just know that there are two different sized hoses used? I would have thought that if the sink drain used a 1" hose the drain in the shower would as well. Not quite. The shower drain is only 3/4". Why I have no clue except for the fact that it is an English built boat. If you have ever owned an English Car, you know what that means!The run of the hoses from the aft head is pretty simple and accessible. It will only take a simple "Y" connection to join the hoses and then run a single hose to the grey water sump. The forward head is a little more problematic. They are connected under the floor of the shower, or I say they were. The connection is a "T" shaped connection but the way that it is set up, I would imagine that the sink tended to back up into the shower. A previous owner disconnected the two hoses, destroying the connector in the process, so while the sink no longer backs up into the shower, it empties into the bilge, along with the shower, because of the broken connection. It appears that a new "Y" connector ( and a new bit of hose for the shower as the old one is old, stiff and cracked) should allow drainage of both toward the bilge.The problem is finding where the other end of the hose exits. I can trace it to where it disappears near the water tank but can seem to find the terminal end. I can't connect it to the grey water sump if I can't find the terminal end. It is the problem when you have several hoses in the bilge and all are the same type and size. Some are connected, some disappear and some are just cut and end in the air. Trying to find which is which and which goes where is an exercise in insanity. I have a terrible sinking feeling ( no pun intended) that the previous owner may have followed his modus operandi and simply cut the thing off somewhere when he couldn't get it to do what he wanted. I am now trying to figure out how to find which hose is the one I want.

On to the heads and holding tanks. Putting a holding thank in the fat head somewhere is going to be a chore. Space is at a premium and it is either already filled with the auto-pilot of refrigeration compressor, or where there is sufficient space, to fill it with a holding tank will block access to seacocks. To use a flexible bladder is a possibility but I fear that if it should wear through a some point, the thought of dumping a full "load" into the bilges would be really awful. It will take more figuring to work that one out.

There actually appears to be a little more room in the forward head. The ELECTROSAN Waste Treatment System is located under the sink and I am planning to move it to the space under the forward bunk. I am going to have to fabricate a shelf-box to hold it but after the propane locker incident, it should be a piece of cake. Running the hose through the bulkhead will be possible and appears that it will not even require buying new hose. This would allow the placement of a small holding tank in the space previously occupied by the ELEctrosan unit. It should be a simple fix.

MASTER'S PERSONAL LOG:

It is slowly getting there. The weather even seems to be getting there. The biggest reason for delay is the yard. And they bare being delayed by one of their suppliers. It is just the way it goes. God is still teaching me patience by giving me lots of situations where one can only be patient. Getting to the point where I don't worry over things I have no control over really reduces acid indigestion and the stress. It all will get done when it all gets done.

Wednesday, May 21, 2008

DOWN TO ONE!!!!!!

SHIP'S LOG:

Leaks that is! It would appear that all of the hatch leaks are fixed. It took two little dabs to catch a little weeping but aside from that, the one leak that remains is in the aft cabin. The problem is finding it. Just like in any structure, where the leak shows up inside doesn't necessarily mean that that is the location where the water is entering. With ABISHAG, there can only be just so many place of entrance, usually fixtures on deck, ie. chainplates, cleats, etc. It then comes down to figuring which one it might be. You just can caulk everything because then you never know where the leak is. Why is that important? Well, a leak is usually a symptom of a larger problem - ie. the need to re-bed a fixture and making sure the water coming in hasn't done any other damage. It also means I have to do it one at a time, test it, and then move on to the next one until the leak stops. Tedious but necessary, especially since it is no fun being asleep and getting dripped on. Say a prayer that the leak is not somehwere under the teak decking. Such a case would not be a good thing!

I have been putting off a rather "odorous" task. There is no holding tank in the aft head. It is direct discharge which is a major no-no inside of the 3 mile limit. Getting stopped by the Coast Guard for a check and not having that head fixed so it doesn't discharge inside the limit is a "nice" fine. I am going to have to find a way to install a holding tank and associated hoses and valves. The "odorous" part of the task is cutting into the existing sanitation hoses to install by-pass and diverter valves. Screw it up and the boat becomes "malodorous"! It will require cutting through bulkheads to do the work and then "repairing" all signs of the effort. More fiberglass work . . .which I love so well.

The foreward head is a little "different" project. The foreward head has an "ELECTROSAN" waste disposal system. It is designed to treat the waste so that it becomes sufficiently "clean" so that it can be discharged into the water. Still the number of locations along the coasts where even this is allowable, unless you are a government craft, are shrinking. Indeed the whole of the ICW is such a zone and since that is where I plan to be heading in the fall, a adjustment to this system needs to be done as well. The ELECTROSAN unit is located under the sink in the foreward head and needs to be re-located. It is not a particularly well done installation. I will probably move the unit under the bunk in the forepeak which is right on the other side of the forehead bulkhead. This will allow for the installation of a small holding tank in the head under the counter which will make the Coast Guard happy and make both heads usable in all circumstances. Again, it will be a "odorous " task, and that includes more cutting and fiberglass work. O FUN, FUN, FUN!!!!

While on this "plumbing" jag, I am going to have to do the plumbing for the head sinks and showers. It will be another one of those down-on-your-knees-in-an-uncomfortable-position reaching-through-the-bilge sort of project. I will have to dismantle the old "grey-water" sump and determine if it is still viable. I tend to think that such will not be the case and it seems that with most of the items on the boat, if it broke, at best it got jury rigged and not fixed or replaced if necessary. I expect that such will be the case with the grey water sump. O well, why should this project be any different.

MASTER'S PERSONAL LOG:

It is getting frustrating! The weather is very "New England-ly" in that it is 70 one day and cold and rainy the next. The wind is almost constantly blowing, and hard. Yesterday, the wind indicator had it hitting the low 40's. The yard is still waiting for filters and so the engine can't be run. The divers haven't set the mooring yet and it is only a matter of time before I get "nudged " out of the slip. I can tell I am getting frustrated because I am having what therapists call "frustration" dreams. Of course, it can all disappear by simply going sailing . . . . and it will happen, and soon.

Wednesday, May 14, 2008

JERRY SURE WAS RIGHT!! ! ! !! ! !!

SHIP'S LOG:

I contacted Jerry Schmitt, my instructor from the Chapman School of Seamanship, about sealing the main hatch. I asked him what was the best marine sealant to use in sealing the plexiglass into the aluminum hatch. Jerry's suggestion and recommendation was "Windshield Weld" from 3-M! So much for "marine" marked stuff.

Jerry did say that it is messy stuff "that gets everywhere" when you use it and boy!, was he right!. It is black in color and all it takes is one little dab in the wrong spot and an attempt to clean it up and it starts to get everywhere! I got to the point where I stopped trying and just sealed the hatch. It will be a lot simpler to removed it after it sets than while it is still workable.

Before I could do the sealing I had to remove "all" of the old sealant. It was a tedious process as the sealant didn't want to go away. It took razor blades, an exacto knife, tweezers, hemostats, dental picks of various styles, and a lot of time! If old sealant remained, the new stuff really wouldn't seal completely and the leaks would remain . . . that is if I had spotted their location correctly. Once I got all the old stuff out, I had to force the new stuff in place. More that just laying in a new bead, it had to be forced into every little crevice and crack. I also made sure that there was enough sealant to insure that any shrinkage and settling would still leave the sealant covering the seam between the plexiglass and hatch frame. I will trim the excess off after it is completely set and easy to cut.

I get to do the interior side of the hatch today. Again there ill be the removal of the old sealant and the laying in a bead of the new. This should be a lot easier as it doesn't seem that the old sealant was forced into the seam between the plexiglass and the hatch frame. Saying that means just the opposite of course and more of the sealant getting where it doesn't belong.

I will also try sealing the mainmast backstay chainplate on the port side. It appears that this is where the leak in the aft cabin stems from and if it is, it will allow me to put the ceiling panels back in place. If it's not, then the hunt for the leak continues. It was be helped by the fact that it is supposed to rain for the next couple of days and it will reveal the leak of not the location. It will help in the search but I am of the mind that it is the chainplate. I hope. I hope. I hope.

MASTER'S PERSONAL LOG:

The wind is still cold and honking down at the boat. It makes it easier not to be moving as it would be not all that comfortable out in the Sound. the list of things to do still grows at one end while it shrinks at the other, but aside from the oil change, everything that "needs" to be done, is completed. Allof the rest to the things can be done at a later time, so things are a little itchy. And as the weather warms, it will be come more so. I can't wait!!!!!!

Monday, May 12, 2008

THREE OUT OF FIVE AIN'T BAD! ! ! ! ! ! ! ! !

SHIP'S LOG:

Three outa five ain't bad! Leaks that is. All of the hatches that I weather sealed were dry except for the main hatch which, naturally, was the one that leaked the most. The good thing is that it became clear where the leak was. Evidently the gasket sealing the Plexiglas to the hatch frame has, after 30 plus years, has finally given up the ghost. The problems should be simple to fix though I am going to have to remove the previous leak fix attempts before I do the job right. I am going to have to remove all of the caulking and silicon that was used, inside and outside, in previous attempts to stem the leak. Again, not a complex fix but one that should be a bit time consuming as all the old caulk/silicon must be removed first before the new stuff is applied. Any of the old stuff will keep the next stuff from adhering and sealing. Then again, as someone said somewhere, "If it takes an hour to do it, then an hour it deserves."

The second leak actually is from a hatch. It appears in the aft cabin and seems to be coming from the Mizzen chainplate or perhaps that grabrail on the aft cabin top. To find out for sure will require removing the aft cabin ceiling panels and possibly cutting an access port in the cover of the bulkhead to find the actual source of the leak. It is not a particularly difficult thing to do, but taking down the ceiling panel means that I will have to disconnect three(3) lighting fixtures and then, having found the leak(and even if the leak isn't found underneath), it all has to be reinstalled. Cutting an access panel to expose the chainplates( if I do one I might as well do both sides) actually is a good idea. Not being able to check the chainplates out from time to time is to run an unnecessary risk. It will allow me to head off problems before they really get out of hand. The "down-side" is that I am going "to have to" do something similar for the chainplates for the main mast as well. Another project for "the To-Do List."

MASTER'S PERSONAL LOG:

The Mooring Committee at TYC has assigned me a new mooring site. Now all that I need to do is contact the Geer Bros and have them set the mooring, then I will have a place to go when they "throw me out" of the Mystic Shipyard. . . . . which should be soon. I can't wait, though it is still cold down along the coast as the breeze is still off the water.

It looks as though God really does know what he is doing. The weather this winter down south was really crappy and now, as the snow birds and Caribbean Sailors are heading north to beat the hurricane season, the weather along the SE Atlantic Coast is rotten. Even those who are doing the Tortola-to-Bermuda Rally are getting pounded. I guess it was a good thing that I wasn't able to go South this year. God took care of me! and I have no doubt that the season up here in New England will be great this year and I am looking forward to enjoying every minute of it.

Wednesday, May 7, 2008

ON & ON & ON! ! ! ! !

SHIP'S LOG:

More little projects getting done. The Hailing/Home Port was affixed under the boat name on each side of the stern. NOW she is officially documented.

I had to rebuild the Workmate Bench that came apart during the Halyard installations. It was no big deal, it just took time. The drill bits really had to work to get through the metal legs. I thought that it was rather mild metal that went into the making of the Workmate bench, but it seems to have a greater toughness than I anticipated. Again, a project that got done but which took a bit more time than anticipated.

I also installed shroud rollers, wooden tubes on the most outboard Mainmast shrouds. These are intended to spin as the Genoa Sheets pass over them, preventing the sheets from rubbing on the shroud and fraying. The look very nautical and will look even more so once I stain and seal them.

The was an actual owner working on his boat in the next slip. He was scrubbing down his teak deck and I queried him about whether he was going to oil it or varnish it or just leave it be. He said that seawater was the best thing for it and he never used anything else. He simply let it weather naturally. I am glad that he reinforced my own ideas and plans for ABISHAG's deck. . . . . .It is also a lot less work.

I am thinking about installing a SAMSON POST/Mooring Bit. This is a metal fixture behind the windlass to which you attach a line which is then attached to the anchor rode to take the strain off the windlass. The windlass is made for hauling the rode( chain and/or line) but is not designed to be a mooring cleat. Not that it would rip out of the deck, but the strain of the boat swinging on it can strip the gears of the transmission which does the hauling. The Samson Post/Mooring Bit is designed to take the strain and it is a relatively inexpensive solution to the problem. Hauling up an all-chain anchor rode would be quite a work out, something I would really like to avoid, hence the thoughts about the installation.

MASTER'S PERSONAL LOG:

It doesn't quite yet feel like Spring down at the Shipyard. The wind is still off the water and is cold. There are still a host of little projects that need doing and the only sail that is in its proper place is the Mizzen, but feeling the deck move and ABISHAG floating and moving with the wind is simply marvelous! I would really like to get over to TYC for the Commission Day on the 23rd and probably will, but I would certainly like to do it with ABISHAG. O I so much want to have that first sail!!!!

Tuesday, May 6, 2008

ANOTHER DAY, ANOTHER JOB DONE!

SHIP'S LOG:

Well, we did get all the rain necessary to trace the hatch leaks but I wasn't down at the boat in the rain. Since such is the case, I have to deal with the leaks going from the simplest fix first and then on to the harder ones. I spent the day installing weather stripping on the four deck hatches. It went simply and without a hitch. . . . . .which is a first for just about every job on ABISHAG. Now, I will have to test the fix out to see if it actually solved the problem. If not, it means that I have to move up to the next, more extensive (and expensive) fix. I am hopeful that this is just another case of a lack of maintenance by the previous owner, examples of which are a legion.

The main cockpit hatch was rebuilt some time in the past and fitted with amber Plexiglas. It adds a view and light into the salon, but it was not fitted tightly. It would allow water (rain) to pool on the hatch and drip into the overhead. I took some of the gasket material I got from Skip and fashioned a seal on the hatch. It seems to function well and I hope it solves the problem. I will test it today along with the hatches. I am also helpful that these fixes will finally seal the boat and keep the water on the outside where it belongs.

In the coaming at the first of the cockpit, there are two holes cut into the it. They are obviously a part of the design of the boat but I have now idea what they are for!I can't seem to trace where they go or what purpose them serve. I don't want to seal them as they might have an important and necessary function, but what it might be I have no clue. I am going to have to go to the owners website and see if any other owners of the 39 has figured them out.

I also created a sign for the auto pilot. This marvelous piece of nautical equipment is really something. A previous owner installed a newer AUTOHELM auto pilot because it was easier to use and ate less power. Evidently, both ere turned on at the same time and worked against each other and the old auto pilot ate the new one's lunch. It literally destroyed it, overloading the controls and breaking the fixtures that were attached to the wheel. The old guy is one powerful piece of equipment. Strangely, it has paper labels on the control panel and, after 30 years, they have seen better days. I used one of the left over plastic strips from the thru-hull project and attached it with SUPER GLUE. Not very nautical but it works!

MASTER'S PERSONAL LOG:

The West Mystic Shipyard is evidently an upscale facility. It doesn't seem as though many of the owners do much of the real work of getting their craft ready for the season. There is something comforting doing as much of the work as I can as it helps me know that the work got done and how it got done. It means that I know ABISHAG better, where and how things are. This creates a much more comfortable feeling about the boat, increasing my confidence in the boat and feeling sure about what she can take. This is not to say that the owners don't work on their boats, but it really seems as though it is more of a matter making sure that the brass is polished and the teak shines and that the larder is well stocked. I have not seen more than a half-dozen or so owners. I am beginning to wonder how much any of these boats get used. They seem more like condo's on the water.

I am hoping that I will be out of here before the end of the month. The season is coming quickly but not quickly enough.