Wednesday, January 21, 2009

It's A New Day ! ! ! ! ! !

SHIP'S LOG:

It's a new day. We have a New President, the sun is shinning and I am one day closer to launching (100 days even!)! ! ! ! !Now if the temperature will just climb a few more degrees and stay there for awhile, all will be well with the world, or at last my little corner of it.

I am actually going to have to start judiciously buying a few items next month for the spring work. Nothing major of course as I can't do major but a few maintenance items nonetheless. The actual work will be more sweat equity type work. I have developed a new project . . . as if I needed anymore to do. Access is always of major importance on a boat, not just for maintenance but also for safety, ie. being able to access the seacock attached to that badly leaking hose for instance. But maintenance is also a key and to that end I want to get all of the wiring out of the bilge, from behind the headliner and as much as possible, run it through cable raceways along the sides of the boat where the headliner(ceiling) meets the bulkhead (wall). Done the right way it will mean ease of access and the ability to add or subtract circuits as needed. Some small portion may still have to go behind the head line as as when a light is located away from the bulkhead and that will be fine, but having 90-95% of the wire instantly accessible, support and high and dry will certainly be an improvement, and a safe one at that.

I spent yesterday going over all the manuals for all of the equipment that is on ABISHAG - Windless, refrigeration, etc. It will all receive the proper maintenance and be up and running by launching or it will be gone. It is sort ridiculous to have stuff on the boat not working and taking up space. I also went over the wiring diagram from the owner's manual. Tougher to understand that someone explaining differential calculus in Chinese. To make matters worse, the diagram is spread over two(2) different pages and is very, very tiny making it almost impossible to read and/or follow. Add to that the factors that a.) it is 31 years old; b.) the boat has had two previous owners who added and removed equipment; c.) that neither was an electrician and so the wiring they added is really follows no logical plan; d.) that rather than pulling out old wire before installing new (no I didn't get it all out last year); e.) that few wires are labeled or even the correct colors ( different colors for connections to different items) - well I could go on but you get the picture - I could probably do as well with a wire diagram from another boat entirely.

O, by the way, I bought (virtually) another boat yesterday. It is a 50' Scarelli Schooner made in Italy. It was for sale for a mere $109,000, and a mere $99,000, and a mere$95,000. The same boat was websites for those three different prices. "From the pictures" it looks a beautiful boat and it is down in Miami. However because the owner is obviously hot to sell it, putting it up for sale at three different prices, and it is a Florida boat ( probably not a lot of sailing or maintenance), and since I don't have even the $95,000, I had to let it go. It was really nice, very well appointed and equipped, and, if I had turned Debbie Soudan loose on the broker, she would have gotten the price down to $80,000 if not less. It was just one of those summer flings in the middle of winter. Once I can start working on ABISHAG, everything will be just fine.

MASTER'S PERSONAL LOG:

Boy, it sure seems that I have been doing not much other than "waiting patiently" for the last two years. I am getting pretty good at it but it is a drag. I want to go sailing. I way to go cruising, I want to go somewhere I have never been before. I haven't been down to the boat as I don't want to see ABISHG snow covered reminding me that this is winter and not just a bad dream or an illusion. Still, i can do no more than wait patiently, preparing for the coming spring work season in anticipation of going sailing and cruising and going to somewhere I have never been before.

Sunday, January 18, 2009

Let it Snow! Let It Snow! Let It Snow! ! ! ! !

SHIP'S LOG:

Might as well let it snow as there is nothing I can do about stopping it. It is something like the advice you are often given about dandelions in your lawn - since you can never really get rid of them, learn to love them. So it is with the snow and the cold in New England and other points north, you can't change the winter weather so you just have to deal with what you get. dealing with weather is one of those curses that particularly afflict sailors. Where's the wind coming from? How strong? Is there rain with it? Will it intensify or diminish? Will it shift its bearing? And on and on and on it goes. It makes a certain sense when you are on the boat heading somewhere, but ashore, with the boat on the hard, it is almost comforting not to really care about what Mother Nature is sending my way outside. Actually the snow (it's snowing right now) is really quite beautiful and I can take an hour or so and just watch it fall. It is really peaceful and relaxing, especially since I know I don't have to deal with shoveling it.

The mystery that is electricity is still a dark one though there seems to be a little bit of light beginning to break in the darkness. Currently I am reading a book by Don Casey on Sailboat Maintenance , the section on electricity. Do states, " The objective of this book is to show you exactly how to service and modify the electrical system on your boat.Assuming the less theory I throw at you, the happier you are going to be, I have included electrical arcana only where it is absolutely essential . . . .I'm not teaching electricity here, I'm just trying to show you how to make a safe, durable connection." I'll see how it goes.

MASTER'S PERSONAL LOG:

The month of January seems to be speeding along. Great! I'm getting closer and closer to Launch Day. I pretty much have the work all planned out, down to the expenses involved. I am chomping at the bit to get started. Having to exercise patience and wait for the weather can be very frustrating, but with all the waiting I have been doing over the last two years, it will pass constructively.

Thursday, January 15, 2009

No News Is Good News! ! ! ! !

SHIP'S LOG:

I have yet to hear from the crew down at the Boat Shop at Captain's Cove Seaport which is both good and bad. Good in the sense I still have time to come up with the deductible (3.2 MUs) and bad in the sense that it means they haven't begun to make a start at doing the work. Intrusion of snow/sleet/rain/runoff into the damage areas of the keel, along with the freezing temps will probably mean that the job will become just a tad bigger. There really is nothing that I can do about it and as you know(if you have been following this blog) from the experience of last Fall, boat yard crews move at their own pace and it is a mystery how and why and when they tackle particular tasks. I just trust that it will get do and done right and done by May 1, 2009.

I also have not heard from the Insurance company since the follow-up contact. They paid off Tow Boat/US and I presume that they have, are, will do the same with Captain's Cove Seaport Boat Yard. Also there has been no word on whether they will institute a premium rate increase or drop me altogether. Again, a good new/potentially bad news situation.

I have spent somewhere in the neighborhood of $10,000 (20 MUs) of various items for the Spring outfitting. Spent it in my mine not in reality. In reality, I haven't got that much, not unless I win Powerball or something. However, expenses should run somewhere around 2 MUs. The bottom paint alone in $109 a gallon and I need two gallons to do the hull. putting the boat aground twice didn't jive well with my plan to just paint the parts that needed painting which you can do with an ablative paint. An Ablative paint dries soft and wears away as you sail. When you have the boat and power wash the bottom, the paint that remains will still be effective when the boat goes back into the water. You don't need to sand the bottom (a hateful job requiring gloves, a respirator, coveralls and a grant from the EPA). One needs only to slap on paint on those places where it has worn away completely and those other places where it is obviously getting thin. Of course, power washing the boat 's hull twice in two months, putting it aground twice in two months, and have hull work done twice in two months goes a long way rendering most of that plan moot.

I am plugging away at the mystery know as electricity. So far, it has only been academic inquiry, no hands on yet. Being dyslexic(SPELL CHECK was crated for me), it is hard for me to follow a lot of the material from the printed page and there is a surprising dearth of videos on the Internet. But I keep plugging away and hopefully when I get to the hands on part, I won't be the cause of another "Great New England Blackout!"

MASTER'S PERSONAL LOG:

105 days to go! It would move a lot faster if I were down at the boat working on stuff and I would be if she were in a shed or undercover, but as she is right now, work is close to impossible. we are half way through January, so time is passing rather quickly, or so it seems, and the weather will so moderate so I can get started. It is waiting until then that is the drag. And I do me DRAG

Saturday, January 10, 2009

ZZZZZZZZ - Hibernating - ZZZZZZZZZZ

SHIP'S LOG:

Unless one builds a shed over one's boat or one enjoys chilblains and frostbite, there is not a great deal that one can do so long as the temperature stays below say 40 degrees Fahrenheit. Most sealants and chemicals won't set or react the way that they should. Metals lose their flexibility and plastics their pliability. Most of the interior gets coated with moisture condensing from your breath as well as from the seaside atmosphere and seemingly the only things that you can really work on have been winterized, at considerable expense, effort and man-hours, and really can't be touched until spring gets here permanently less the damage you sought too prevent takes place during a sudden "Hey!-It-wasn't- suppose-to-freeze-anymore" surprise last shot of winter. Add to this you have two choices of dress: 1.) like Nanook of the North - bundled up enough to stay warm but so much so that you don't have enough flexibility to actually work on anything; and 2.) wearing so few items that you can move and get into places you need to at the risk of contracting pneumonia when you stop working and your sweat freezes. No, winter is still for boating but virtual boating.

I have already put together a list of this year's Spring Projects - the Necessary, the Nice to have, and the No Way I can afford it. I spend some time on the Net looking at boating sites and looking at pictures of boat similar to ABISHAG. I was able to actually find pictures of other Camper Nicholson 39 Ketches though there are only 4 out there for sale at the present time. I examine the pictures to see how various owners have dealt with issues such as I have on ABISHAG. In some cases, I have found some rather interesting approaches that just may be worth trying this Spring. And examining the other ketches of a similar size, other approaches, from the very simple and inexpensive to the insanely complex and expensive present themselves. I take my time to sort through these projects and incorporate those that seem feasible and worthwhile.

The only downside of this type of web surfing is that so many of the boat you see look " so much better" than what you have at the present time. Actually, in most cases, they are not, for every boat is a compromise and every boat comes with its own unique set of problems, ghosts and gremlins. And if it is a used "lightly pre-owned" boat, odds are that the previous owner(s) have installed(usually poorly) equipment that no longer works or have performed repairs that are ham-handed and badly done. It is why there are SURVEYORS but you can't really survey solely by photographs on a website. Actually this type of boating fantasy usually happens in the winter and continues to the Spring when it becomes the inspiration and driving force behind your own poor installations an badly done repairs.

MASTER'S PERSONAL LOG:

I hate winter, this one especially, since I didn't plan to be here where there comes snow and ice. It is only 110 days until I "have to be," by contractual obligation, in the water and hopefully will be before that date, but 110 is good enough for counting down.

No indication that any repair work has yet been done . . .and that's a good thing because once it is done, the insurance company will seen a check for the amount - less the $1,600 deductible - to the Yard Repair Shop and they will want that $1,600 ASAP. Right now, I don't have the $1,600 and it will take some time to raise it. So it is that the longer they delay the work, the better I'll be - in a financial sense.

And speaking of sense, making none is electricity. I am going to have to sit down with an electrician and see if he might be able to impart the wisdom of his craft. It is important for marine electrical/electronic items seam to be hyper-sensitive and one small poke or prod in the wrong spot at the right time can induce an expensive catastrophe - read lots of Marine Units wasted.

Thursday, January 1, 2009

RESOLUTIONS FOR THE NEW YEAR !!!!!

SHIP'S LOG:

In keeping with our cultural tradition for the day, I thought it would be a good idea to put forth some resolutions for the coming year. . . . . and then see how long it takes for me to break them. A resolution is, after all, a lot less binding than a promise and carries with it little penalty aside from the embarrassment for failure, but then the number of people who will be in the same state will be legion.

My first resolution will be not to run aground again! It is getting on toward a month since I last "discovered land," then again, it is hard to "run aground" when one is not in the water! To keep this First Resolution, the Second Resolution is needed . . . . .

"do better at planning trips." Actually, I had thought that I had done this very well as I knew exactly where I was when I ran out of water. I suppose that it is not so much "the planning" part that needs the work so much as paying better attention to what I "planned!" It would have help that much in the New Haven debacle but certainly would have been most beneficial at Southport in recognizing I was in the wrong harbor and using the wrong chart. As someone once noted, it is not the water that is the danger for a boat, rather it's the hard parts around the edges that cause most of the problems.

The Third Resolution, complete all of the projects/jobs necessary to be done before launch. Now that might seem like a no brainer, but it all has to do with your definition of necessary. The absolute- bare bones - priorities are to 1.) Keep water outside the boat; 2.) Keep the rig on the boat; 3.) Keep the keel, hull and deck intact; 4.) Be able to control the vessel's direction; 5.) Keep the crew onboard; 6.) Know where you are and where you are going. Thus it is that replacing the zincs, painting the bottom, replacing the packing in the stuffing box and other such items, 27 in total, are necessary, but . . . . . they can all actually be delayed for another season "if", if one is willing to run the risk of having to do them at a highly disadvantageous time, in a certainly more difficult situation and location, at what will undoubtedly be at a much greater financial price. Every boat owner lets something slide each year in the rush to get "into the water." Considering how things have gone, it is probably best that I resolve not to do so this year and get them all done.

The Fourth Resolution will be to "GO SOUTH!" I will get out of Long Island Sound! I will get through New York Harbor! I will get down the Jersey Coast and up the Delaware Bay! I will get into and through the Chesapeake Bay! I will traverse the ICW! I will get to the Decision Point (Fort Lauderdale) and either continue to the Keys or head for the Bahamas. I will! I will! I will!
Well, I will if everything works out. If it was merely a question of resolve, I'd be there already, laughing at everybody up here in the cold and snow. Still, I resolve to do it! ! ! ! ! ! ! ! !

MASTER'S PERSONAL LOG:

It is always a good thing to keep one list of resolutions small, as the fewer the number of resolutions, the easier it is to keep them. Looking out on the snow and the thermometer that hovers in the single digits, sailing seems a long way away but it is merely 120 days or less if I get the work done early. Trying to live in the moment while trying to make plans for the future seems kind of counter-intuitive and tends to give me a headache. I wish that the weather would break and there would e a short winter so that I can get started on stuff. It is no fun working around a boat, inside or out, when the weather is cold. It makes everything exponentially more difficult and raises the screw-up quotient significantly. Waiting and simply being present can be a real struggle. Thank goodness I don't have any Marine Units or I would be spending them like a drunken sailor . . . . sort of appropriate, on stuff that I really don't need. So I will enjoy the beauty of the day and pray for an early, very early, incredibly early Spring!

Thursday, December 25, 2008

Merry Christmas ! ! ! !

SHIP'S LOG:

I am off at my sister's in Newport, RI, "where the elite meet to eat!" Perhaps the one great thing about have a mental vapor lock that put poor ABISHAG aground is that I get to celebrate
Christmas with family and friends . . . . . plus I don't have to cook!! ! ! !...which is perhaps the best part.

Another good point is that ABISHAG is on the hard along the coast of Connecticut which means the storms of the past weekend covered her mostly with rain and not snow and/or ice.
despite what some people think water doesn't seem to harm boats, though ice and snow, especially when they go through the freeze - thaw - freeze - thaw - freeze two step tend actually to do a lot of damage, mostly hidden until something breaks or goes south and you suddenly find where all that melt water went!

After the turn of the new year, I will pay her a visit and begin to lay out the projects: 1.) those that need to be done before launching; 2.) those that can be done after launching; 3.) those that are not needed but would be very helpful; and 4.) those that are completely unnecessary but are wonderful. It would be: 1.) painting the bottom; 2.) rigging the new halyards; 3.) installing new shelves; 4.) putting in a Jacuzzi( I didn't say realistic!) It will be time to get started, after all the days are getting longer.

MASTER'S PERSONAL LOG:

I bought another Powerball ticket to see if my winning a jackpot had become part of God's plan. It's tough to say as I actually got one, count it "1", correct number. The first bill from the Seaport showed up . . . . $800. The tow company bill American Express and then got paid directly by the insurance company and so are sending me a credit . . .. . . I hope!




































p









n

Saturday, December 20, 2008

And It Is Not Even Winter Yet ! ! ! ! ! !

SHIP'S LOG:

In that ABISHAG is almost 70 miles distant and I have not heard anything to the contrary, I am presuming all is well with her. I contacted the Insurance company and they had not gotten an estimate from Captain's Cove Seaport as of yet, so they were going to contact them. It seems to be a cases of everybody involved waiting for everybody else, or somebody else, to blink first and make the first move. I am not sure what everyone is waiting for but I am not worrying about it as there is nothing I can do about it . . . except enjoy the snow, "spend" lots of imaginary Marine Units, plumb the depths of the mysteries of electricity and make plans for projects for the Spring.

Along with Christmas Cards, I am getting besieged with offers from various financial institutions to "lend me money." Actually, the basically want to refi my mortgage. They say I am pre approved but they will drop that as soon as they find that my condo 1.) is not a full-time residence( and so is considered an "investment Property); and/or 2.) that one entity owns more than 10% of the condos in the complex; and/or 3.) the condo hasn't been off the market for their criteria of days. No one likes a tease! At lease I am able to block the offers that come by email.

MASTER'S PERSONAL LOG:

Well, this certainly the scenario I had in mind at this time last year. Out of dangerous curiosity, i check the weather down the ICW. Virginia - l0w 60's; North Carolina - mid to upper 60's; South Carolina - upper 60's . . . I stop there as I didn't want to perform any more self-torture. Truth be told though, I am pretty peaceful about it all, as there is really nothing I can do about it except accept it and go with the flow. I spent as hour watching it snow yesterday and as "a living in the moment" moment it was rather fine. Now if I can only get a chance to experience a "Green Flash" before Christmas 2009, that would also be very fine.